Safe removal of tower crane

Column:Industry news Time:2019-11-14
Safe removal of tower crane


First of all, in terms of power supply, the construction site needs to provide three-phase five-wire braking power supply for tower crane with a supply voltage of 380V.


Before the operation, the technical person in charge and the safety officer shall disclose the safety technology of all the workers participating in the operation and learn the "tower crane disassembly plan".


The tower crane lessee shall make all inspections and records before disassembling and assembling the tower crane. Before each operation, the team leader shall divide the work of the operators and conduct safety education before the work, and strictly implement the self-inspection and mutual inspection system.


Survey and coordinate the construction site in advance, and prepare transport vehicles. It is strictly forbidden to take part in the work after drinking or feeling unwell. All personnel must wear safety helmets when entering the construction site.


Adequate installation site and transport road will be provided. Site cooperation for the safety supervision of the disassembly operation. Set up a safe operation area, with specially-assigned personnel to take care of.


Here to remind everyone, at the end of the project, more need to pay attention to safety issues. And the tower crane disassembly process, is also very prone to accidents in a link, we still have to be careful.